Skip to main content

πŸ›£ Project Roadmap

At 1it.pro, we value transparency. The entire process of working on your project is divided into clear stages with defined deliverables.

Methodology

We work using an agile methodology (Agile/Scrum). Every 2 weeks, we conduct a demo presentation of completed functionality. You always see the progress.

πŸ“‹ Stage 1: Discovery and Estimation (1-5 days)​

Before writing code, we need to understand the task.

  • Actions: Interview, filling out the Brief, competitor analysis.
  • Result: Technical specification (TS) and an accurate estimate.

🎨 Stage 2: Design and Layout​

Creating the visual identity and product logic.

  • UX (Logic): Creating Wireframes (screen layouts).
  • UI (Design): Drawing design mockups in Figma.
  • Result: A clickable prototype of the future website/application.

πŸ’» Stage 3: Development (Sprints)​

The longest stage. We divide work into sprints (usually 2 weeks each).

SprintWhat We DoResult
BackendDatabase setup, API, Servers (Hetzner)Working system core
FrontendLayout, React/Next.js componentsVisual part
IntegrationsConnecting Stripe, CRM, AIWorking services

πŸ§ͺ Stage 4: Testing (QA)​

Our QA engineers test the product before launch.

  • Functional testing.
  • Load testing.
  • Security audit (OWASP).

πŸš€ Stage 5: Release and Support​

  • Deployment to production servers.
  • Domain and SSL configuration.
  • Handing over access credentials to the client.
  • Warranty period: 3 months of free bug fixes.

Ready to start? Go to Budget Planning.